BSAI Crab Plan Team Meeting
September 10-13, 2018
Traynor Room
Alaska Fisheries Science Center
7600 Sand Point Way NE, Bldg. 4
Seattle, WA
| Monday - September 10, 2018 | ||
| 1. ADMINISTRATION - Introductions; finalize agenda; minutes assignments; documents/timing for next Council meeting (October). Webex information posted daily to North Pacific Council’s Crab Plan Team webpage and Google Calendar | ||
| Attachments: | assignments_Sept2018_Ben -Uploaded: 04/07/2019 10:18 AM AKDT | |
| 2. Survey and Catch Updates - EBS trawl survey, St. Matthew Is. pot survey, Crab catch overview | ||
| Attachments: | 2018_CrabEBSsurvey_DRAFT -Uploaded: 04/07/2019 10:19 AM AKDT | |
| 2018 Catch presentation -Uploaded: 04/07/2019 10:21 AM AKDT | ||
| St Matts 2018 survey 090918 -Uploaded: 04/07/2019 10:21 AM AKDT | ||
| incidentallyRetainedCatch -Uploaded: 04/07/2019 10:21 AM AKDT | ||
| 2018 EBS CPT Presentation_091018 -Uploaded: 04/07/2019 10:21 AM AKDT | ||
| CPT_PSC_2018 -Uploaded: 04/07/2019 10:21 AM AKDT | ||
| 3. EBS Ecosystem Report - 2017-18 update | ||
| Attachments: | EcoCons2018_SeptCPT -Uploaded: 04/07/2019 10:22 AM AKDT | |
| 4. SMBKC - Final Assessment: stock status, OFL and ABC | ||
| Attachments: | smbkc -Uploaded: 04/07/2019 10:22 AM AKDT | |
| Fixed Gear GF harvest BKC bycatch in SMBKC area -Uploaded: 04/07/2019 10:22 AM AKDT | ||
| SMBKC_bycatch_ests_crabfish -Uploaded: 04/07/2019 10:22 AM AKDT | ||
| FINAL 6-SMBKC_SAFE_2018 -Uploaded: 04/07/2019 10:22 AM AKDT | ||
| Tuesday - September 11, 2018 | ||
| 5. EBS Tanner Crab - Final Assessment: stock status, OFL and ABC; BSFRF selectivity and study; Tanner crab MSE and harvest strategies | ||
| Attachments: | TannerCrab201809_SAFEChapterToCPT.MainSection -Uploaded: 04/07/2019 10:28 AM AKDT | |
| App_A.FisheryData.ADFG.RetainedCatch -Uploaded: 04/07/2019 10:28 AM AKDT | ||
| App_B.FisheryData.ADFG.TotalCatch -Uploaded: 04/07/2019 10:28 AM AKDT | ||
| App_C.FisheryData.ADFG.FisheryEffort -Uploaded: 04/07/2019 10:28 AM AKDT | ||
| App_D.FisheryData.GTF_reduced -Uploaded: 04/07/2019 10:29 AM AKDT | ||
| App_E.SurveyData.NMFS.TimeSeries -Uploaded: 04/07/2019 10:29 AM AKDT | ||
| App_G.MaleMaturityData -Uploaded: 04/07/2019 10:29 AM AKDT | ||
| App_H.GrowthData -Uploaded: 04/07/2019 10:30 AM AKDT | ||
| App_I1.AggCatchData -Uploaded: 04/07/2019 10:30 AM AKDT | ||
| App_I2.SurveySizeComps -Uploaded: 04/07/2019 10:30 AM AKDT | ||
| App_I3.FisherySizeComps -Uploaded: 04/07/2019 10:30 AM AKDT | ||
| App_I4.ModelFits.ZCsByYear -Uploaded: 04/07/2019 10:30 AM AKDT | ||
| App_I5.OtherData -Uploaded: 04/07/2019 10:30 AM AKDT | ||
| App_I6.PopProcesses -Uploaded: 04/07/2019 10:30 AM AKDT | ||
| App_I7.PopQuantities -Uploaded: 04/07/2019 10:30 AM AKDT | ||
| App_I8.SurveyCharacteristics -Uploaded: 04/07/2019 10:30 AM AKDT | ||
| App_I9.FisheryCharacteristics -Uploaded: 04/07/2019 10:30 AM AKDT | ||
| App_J.PopQuantities.17AM-18C2a -Uploaded: 04/07/2019 10:30 AM AKDT | ||
| App_K.TCSAM02Description -Uploaded: 04/07/2019 10:30 AM AKDT | ||
| BSFRF 2017 Bairdi Workshop SummaryInfo 09.10.18 -Uploaded: 04/07/2019 10:30 AM AKDT | ||
| Tanner crab harvest stargey scenarios_091018 -Uploaded: 04/07/2019 10:30 AM AKDT | ||
| CPTBriefing_TannerCrab2018 (1) -Uploaded: 04/07/2019 10:31 AM AKDT | ||
| GoodmanBSFRF - Sep CPT 2018 -Uploaded: 04/07/2019 10:31 AM AKDT | ||
| CPTBriefing_TannerCrab2018.Day2 -Uploaded: 04/07/2019 10:31 AM AKDT | ||
| App_L.TannerCPTrecomendedModelResults -Uploaded: 04/07/2019 10:31 AM AKDT | ||
| FINAL 3-TannerCrab201809_SAFEChToSSC.MainSection -Uploaded: 04/07/2019 10:31 AM AKDT | ||
| 6. BBRKC - Final Assessment: stock status, OFL and ABC | ||
| Attachments: | BBRKC_SAFE_2018 -Uploaded: 04/07/2019 10:33 AM AKDT | |
| GMACS Progress for CPT -Uploaded: 04/07/2019 10:33 AM AKDT | ||
| bbrkc18f -Uploaded: 04/07/2019 10:33 AM AKDT | ||
| BBRKC EFP -Uploaded: 04/07/2019 10:33 AM AKDT | ||
| GMACS Progress Report -Uploaded: 04/07/2019 10:33 AM AKDT | ||
| FINAL 2-BBRKC-SAFE_2018_Final -Uploaded: 04/07/2019 10:33 AM AKDT | ||
| 7. AIGKC - Update on catch & State HRC simulations preliminary results | ||
| Attachments: | AIGKCStateHarvestStrategySimulations_7Sep2018Draft -Uploaded: 04/07/2019 10:34 AM AKDT | |
| AIGKC_harvstrat_update091018 -Uploaded: 04/07/2019 10:34 AM AKDT | ||
| FINAL 8-AIGKC_SAFE_2018 -Uploaded: 04/07/2019 10:34 AM AKDT | ||
| Wednesday - September 12, 2018 | ||
| 8. Snow Crab - Final assessment: stock status, OFL and ABC | ||
| Attachments: | SnowCrab_SAFE_2018 -Uploaded: 04/07/2019 10:35 AM AKDT | |
| BS Snow Crab PSC Action Plan -Uploaded: 04/07/2019 10:35 AM AKDT | ||
| BS snow crab PSC Motion Feb2016 -Uploaded: 04/07/2019 10:35 AM AKDT | ||
| Eastern Bering Sea snow crab stock assessment_post -Uploaded: 04/07/2019 10:35 AM AKDT | ||
| FINAL 1-EBS SnowCrab_SAFE_2018 -Uploaded: 04/07/2019 10:35 AM AKDT | ||
| 9. NSRKC - Model discussions and scenarios for January 2019 assessment | ||
| Attachments: | NS RKC SAFE -2019_main -Uploaded: 04/07/2019 10:35 AM AKDT | |
| Tables -Uploaded: 04/07/2019 10:35 AM AKDT | ||
| Figures -Uploaded: 04/07/2019 10:35 AM AKDT | ||
| Appendix A -Uploaded: 04/07/2019 10:35 AM AKDT | ||
| Appendix B -Uploaded: 04/07/2019 10:35 AM AKDT | ||
| Appendix C1 -Uploaded: 04/07/2019 10:35 AM AKDT | ||
| Appendix C2 -Uploaded: 04/07/2019 10:35 AM AKDT | ||
| Appendix C3 -Uploaded: 04/07/2019 10:35 AM AKDT | ||
| NS_RKC_SAFE2019_CPTSep -Uploaded: 04/07/2019 10:35 AM AKDT | ||
| 10. WAIRKC, PIGKC - Overfishing status determination | ||
| 11. PIRKC, PIBKC - 2018 survey and bycatch update | ||
| Attachments: | PIBlueKC_SurveyBycatchUpdate0918 -Uploaded: 04/07/2019 10:36 AM AKDT | |
| PIRedKC_SurveyBycatchUpdate0918 -Uploaded: 04/07/2019 10:36 AM AKDT | ||
| Thursday - September 13, 2018 | ||
| 12. Other Business - Planning for January CPT meeting; other 2019 meetings | ||
| 13. ALL PUBLIC COMMENT | ||
| Attachments: | BraxtonDew_RewrittenHistory_0918 -Uploaded: 04/07/2019 10:36 AM AKDT | |