Scientific and Statistical Committee - October meeting
The Council's Scientific and Statistical Committee will meet by webconference.
September 28-October 2, 2020
8am to 3pm Alaska time / 9am to 4pm Pacific time, daily
Adobe Connect Link: https://npfmc.adobeconnect.com/ssc/
Public comment: Please submit written comment specifically for the SSC by clinking on the 'Comment Now' links next to the relevant agenda item, below. The deadline for written comments for the SSC is 5:00 pm (AST) on Friday, September 25, 2020. The SSC will also take oral testimony during the meeting. A signup sheet will be linked below before the meeting. The SSC meeting will be held on Adobe Connect - to participate please log in on the link above, and have the meeting call you. If you cannot get online, you can dial 1-800-832-0736 room number 2605442#
Please note, this eAgenda is separate than that for the main October 2020 Council meeting. See there for meeting materials, presentations, and public comment on the Advisory Panel or Council meetings.
A CALL MEETING TO ORDER | ||
Schedule | ||
Attachments: | Schedule (hyperlink) -Uploaded: 09/04/2020 08:36 AM AKDT | |
Short Summary of Agenda Items -Uploaded: 09/21/2020 09:26 AM AKDT | ||
Administrative issues | ||
Attachments: | PPT SSC Admin Issues Oct 2020 -Uploaded: 09/28/2020 09:41 AM AKDT | |
C MAJOR ISSUES / FINAL ACTION ITEMS | ||
0 Comments | C1/C2 Ecosystem Status Report - October Preview | |
Attachments: | PPT C1C2 Ecosystem Status Report -Uploaded: 09/27/2020 09:45 PM AKDT | |
0 Comments | C1/C2 Survey loss uncertainty | |
Attachments: | C1C2 Evaluating survey data -Uploaded: 09/23/2020 12:42 PM AKDT | |
PPT C1C2 Evaluating Survey Data -Uploaded: 09/27/2020 09:47 PM AKDT | ||
3 Comments | C1 BSAI Crab 4 Stocks - Final Specifications, SAFE report, Crab Plan Team Report | |
Attachments: | C1 BSAI Crab SAFE Intro -Uploaded: 09/23/2020 10:22 AM AKDT | |
Crab Plan Team e-Agenda (hyperlink) -Uploaded: 09/04/2020 08:14 AM AKDT | ||
C1 Crab Plan Team Report Sept 2020 -Uploaded: 09/24/2020 02:31 PM AKDT | ||
C1 1 Snow Crab SAFE -Uploaded: 09/23/2020 10:23 AM AKDT | ||
C1 2 BBRKC SAFE -Uploaded: 09/23/2020 10:23 AM AKDT | ||
C1 3 Tanner Crab SAFE -Uploaded: 09/23/2020 10:23 AM AKDT | ||
C1 4 PIRKC SAFE -Uploaded: 09/23/2020 10:24 AM AKDT | ||
C1 5 PIBKC SAFE -Uploaded: 09/23/2020 10:24 AM AKDT | ||
C1 6 SMBKC SAFE -Uploaded: 09/23/2020 10:24 AM AKDT | ||
C1 7 NSRKC SAFE -Uploaded: 09/23/2020 10:25 AM AKDT | ||
C1 8 AIGKC SAFE -Uploaded: 09/23/2020 10:25 AM AKDT | ||
C1 9 PIGKC SAFE -Uploaded: 09/23/2020 10:25 AM AKDT | ||
C1 10 WAIRKC SAFE -Uploaded: 09/23/2020 10:25 AM AKDT | ||
PPT C1 BSAI Crab -Uploaded: 09/27/2020 09:47 PM AKDT | ||
PPT C1 Snow crab -Uploaded: 09/27/2020 09:47 PM AKDT | ||
HANDOUT - C1 BSAI Crab Specifications -Uploaded: 09/29/2020 04:02 PM AKDT | ||
C1.1 Public testimony on remainder of CPT report | ||
0 Comments | C2 Joint Groundfish Plan Team - Report | |
Attachments: | Joint Groundfish PT e-Agenda (hyperlink) -Uploaded: 09/04/2020 08:15 AM AKDT | |
C2 Joint PT Minutes -Uploaded: 09/18/2020 01:50 PM AKDT | ||
PPT C2 Joint Plan Team report -Uploaded: 09/28/2020 07:45 PM AKDT | ||
5 Comments | C2 BSAI Groundfish Harvest – Proposed Specifications, Plan Team Report | |
Attachments: | C2 BSAI PT Minutes -Uploaded: 09/18/2020 01:50 PM AKDT | |
C2 BS Pcod Preliminary Assessment 2020 -Uploaded: 09/18/2020 01:26 PM AKDT | ||
C2 EBS Pacific cod alt base model -Uploaded: 09/21/2020 01:32 PM AKDT | ||
C2 BSAI PT Proposed Specs Tables -Uploaded: 09/22/2020 04:49 PM AKDT | ||
PPT C2 BSAI Plan Team Report -Uploaded: 09/28/2020 07:46 PM AKDT | ||
C2a BSAI - Public testimony on Pacific cod | ||
C2b BSAI - Public testimony on proposed BSAI specifications (including sablefish) | ||
0 Comments | C2 GOA Groundfish Harvest – Proposed Specifications, Plan Team Report | |
Attachments: | C2 GOA PT Minutes -Uploaded: 09/18/2020 01:50 PM AKDT | |
C2 GOA PT Proposed Specs Tables -Uploaded: 09/25/2020 09:07 AM AKDT | ||
PPT C2 GOA Plan Team Report -Uploaded: 09/30/2020 03:49 PM AKDT | ||
0 Comments | C4 Cook Inlet Salmon FMP – Initial Review | |
Attachments: | C4 Cook Inlet Salmon Initial Review -Uploaded: 09/09/2020 11:53 AM AKDT | |
C4 Appendix 11 -Uploaded: 09/09/2020 11:54 AM AKDT | ||
C4 Appendix 12 -Uploaded: 09/09/2020 11:54 AM AKDT | ||
PPT C4 Cook Inlet Salmon FMP -Uploaded: 09/29/2020 11:58 AM AKDT | ||
1 Comment | C6 BSAI Halibut ABM – Initial Review Draft EIS | |
Attachments: | C6 ABM Draft DEIS Analysis -Uploaded: 09/22/2020 05:22 PM AKDT | |
C6 REVISED 9-30-20 ExecutiveSummary -Uploaded: 09/30/2020 02:50 PM AKDT | ||
C6 Errata Revised Section 6.4.4_9-30-20 -Uploaded: 09/30/2020 02:49 PM AKDT | ||
C6 Appendix 1 Halibut ABM DEIS SIA -Uploaded: 09/09/2020 11:59 AM AKDT | ||
C6 Supplemental Errata for Halibut ABM DEIS -Uploaded: 09/30/2020 04:36 PM AKDT | ||
PPT C6 ABM -Uploaded: 10/02/2020 07:58 AM AKDT | ||
D OTHER ISSUES | ||
0 Comments | D1 Survey Planning – AFSC report on 2021 Surveys | |
Attachments: | D1 NPFMC Letter to AFSC Re Surveys 2021 -Uploaded: 09/18/2020 05:38 PM AKDT | |
D1 AFSC Response Letter on Surveys 2021 -Uploaded: 09/18/2020 05:38 PM AKDT | ||
PPT D1 AFSC Survey Planning -Uploaded: 09/28/2020 07:46 PM AKDT | ||
1 Comment | D1 Survey Planning - SSC Subgroup Report | |
Attachments: | SSC Subgroup e-Agenda (hyperlink) -Uploaded: 09/04/2020 08:17 AM AKDT | |
D Report of SSC Survey subgroup -Uploaded: 09/18/2020 05:15 PM AKDT |